Single-line diagram maker for your panel
Build the rail from ABB devices and the diagram draws itself: incomer, RCDs, circuits with cables and power, a circuit schedule and check hints. Works for a flat or a house consumer unit. Printable A4 PDF — free.
- No sign-up
- QF, QD, QFD references
- Hints are for reference
Build the rail from devices
Click devices in the palette: they go onto the rail in order and to scale. Place them left to right, as in the panel: the diagram is built from that order. The same panel opens on the “Labels” and “Panel size” pages.
A rail that matches your panel exactly: incomer, RCDs and breakers in their places. From it the diagram works out what feeds what.
Check connections and enter the loads
Connections follow the order on the rail: an RCD feeds everything to its right up to the next RCD or switch disconnector. If your panel is different, choose what the circuit sits under. Enter the name, cable and power: they go into the table under the diagram.
Each circuit has a name, cable, power and phase. The name is shared with the label in “Labels”: enter it once and it shows in both places.
Review the diagram and get the PDF
A4 landscape sheets: the diagram on top, the circuit schedule below. A large diagram is split across sheets, with a note at each break saying where it continues. No formal drawing frame: it's a working diagram for the panel and the owner.
One PDF: vector, any alphabet, scaled to A4. The “for reference” hints are not included in the file, they're just for you.
How to read and draw a panel single-line diagram
A single-line diagram shows the panel with one line per circuit: where the supply comes in, which devices it passes through and where each circuit goes. You read it top to bottom. Below is how to read a finished diagram and how to draw your own.
- Incomer at the top
At the very top is the supply, then the main switch or breaker, then the energy meter, voltage relay and SPD. Everything below is fed through them.
- The thick line is the busbar
The horizontal line in the middle is the panel's main busbar. RCDs, RCBOs and standalone breakers drop down from it.
- Under an RCD are its circuits
Breakers under an RCD are protected by it, and on the diagram they hang off its line. An RCBO protects only its own circuit and sits straight on the busbar.
- Reference and rating
Every symbol has a reference in order (QF1, QF2…) and a rating. C16 is a 16 A breaker with a type C curve; an RCD shows its current and trip setting, for example 40 A and 30 mA.
- Circuit schedule
Under the diagram is a table: for each circuit the device, protection, phase, cable, power and purpose. It tells you what is connected where without opening up the panel.
- Hints are for reference
Notes point out typical mistakes: breaker larger than the cable, sockets without an RCD, phase imbalance. They're hints, not a verdict: the final decision is the engineer's.
How to draw the diagram step by step
- Build the rail. Place the same devices in the same order as in the panel: left to right, row by row. Order matters: it decides what sits under which RCD.
- Check the connections. If a breaker isn't fed from the nearest RCD to its left, choose the right source in the “Sits under” list.
- Enter the name, cable and power. The name should make sense to someone opening the panel for the first time. Power is needed for phase balancing and for the schedule.
- Read the hints and get the PDF. Fix what you think is a mistake and leave the rest. Print the file or keep it with the panel documents.
Symbols used on the diagram
References follow device type and order on the rail. The symbols are the same as in the studio: a switch blade with a cross for a breaker, an oval for an RCD, a rectangle for a meter or relay.
| Symbol | Reference | What it is | What it looks like |
|---|---|---|---|
| QF | Circuit breaker (MCB) | Switch blade with a cross on the fixed contact; ticks show the number of poles | |
| QFD | RCBO: a breaker with a built-in RCD | Like a breaker, plus an oval on the line | |
| QD | RCD: residual current device | Switch blade with a circle and the oval of the differential transformer | |
| QS | Switch disconnector, isolator | Switch blade with a circle and a bar at the end | |
| KM | Contactor, impulse relay | Semicircle on the contact | |
| KV | Voltage monitoring relay | Rectangle with the letter U | |
| FV | SPD: surge protection device | Varistor connected to the PE bar | |
| PI | Energy meter | Rectangle labelled Wh | |
| KT | Timer | Rectangle with the letter t | |
| XS | DIN-rail socket | Rectangle labelled XS |
Questions about single-line diagrams
Didn't find an answer? Build the panel in the studio: the diagram is built along with the project and formatted to the standard you choose.
What is a panel single-line diagram?
It's a simplified drawing of the panel: each circuit is drawn as one line, even though physically it has two, three or five conductors. It shows where the supply comes in, which devices it passes through and which circuits leave the busbar. It's handy to keep with the panel documents.
How is a single-line diagram different from a wiring diagram?
A single-line diagram shows which devices there are and how they connect: incomer, RCDs, circuit breakers. It doesn't show terminals or every wire, that's what a wiring diagram is for. You read a single-line diagram to understand how the panel is protected.
How are breakers and RCDs labelled on the diagram?
By device type and order on the rail: QF is a circuit breaker, QFD an RCBO, QD an RCD, QS a switch disconnector, KM a contactor, KV a voltage relay, FV an SPD, PI an energy meter. Numbers go up left to right: QF1, QF2 and so on. There's a table of symbols further down this page.
How does the page know which RCD a breaker sits under?
From the order on the rail: an RCD feeds everything to its right up to the next RCD or switch disconnector. The first switch or breaker in the panel is treated as the incomer, and the energy meter, voltage relay and SPD sit on the incomer. If your panel is different, on the “Connections” step you can choose what each circuit sits under.
How do I choose the cable for a circuit?
Pick a cross-section from the list or leave automatic selection: it chooses a cable with headroom for the breaker rating. As a check, the page compares the breaker rating with the current rating of copper cable in conduit (Russian PUE code, table 1.3.4): for example, 17 A for 1.5 mm². It's a hint, not a calculation: cable length, installation method and voltage drop are not taken into account.
What does “for reference” mean?
It marks check hints: breaker larger than the cable, sockets without an RCD, circuit larger than the incomer, RCD smaller than the breaker, phase imbalance, no incoming device. They catch typical mistakes but don't replace a design or an engineer's decision. If a hint doesn't apply to your panel, you can ignore it.
How do I balance the load across phases?
In a three-phase panel the page spreads single-phase circuits across L1, L2 and L3 so the phase loads are close. For that, enter each circuit's power on the “Connections” step. Three- and four-pole devices take all three phases. You can change any phase by hand; an imbalance above 30 % is highlighted.
Can I use this PDF to hand over a job or a design?
The PDF is a clear working diagram of the panel: devices, ratings, cables, power and a circuit schedule on A4 sheets. It has no formal drawing frame or title block. Sheets formatted to GOST, IEC or BS 7671 are made in the studio.
Is it free? Do I need to sign up?
Free, with no sign-up and no payment: the diagram and PDF are made right on this page.
Will my diagram be saved?
The panel is saved in this browser automatically, and the same panel opens on the “Breaker labels” and “Panel size” pages. Nothing is sent to a server. The PDF arrives by email: save it with your panel documents.
In the studio this happens by itself
- 01The diagram follows the panel
Devices and connections come from what you built, no need to redraw the diagram.
- 02Sheets to GOST, IEC, BS 7671 or German style
The frame and title block follow the sheet style you choose: GOST, IEC, BS 7671 or “Germany — Stromlaufplan”. GOST, IEC and BS 7671 include a circuit schedule.
- 03Warnings while you work
The studio shows build errors straight away: for example, a cable too small for its breaker or 230 V mixed with another circuit.
The studio runs in the browser, nothing to install.